Theme: Blue and Green Theme: Blue and Green Theme: Red Theme: Green
Font: IncreaseFont: NormalFont: Decrease
Background: 1 Background: 2 Background: 3 

Last Update: 24 Mar 2019
Version 8.2.0a

 HEADQUARTERS ADDRESS

google map 2nd Floor, Electra House
Power Street, 
93000 Kuching, Sarawak

phone+6082- 234 092/234 093

picture+6082- 234 096




SRB Facebook Page
(Click FB logo down below)

Facebook page
SRB Hotline

WORKING HOURS

MON- THURS : 8:00 AM - 5:00 PM

FRIDAY   : 8:00 AM - 11:45 PM

2:15 PM - 5.00 PM

Scan for mobile web
                qrcode

online visitor Online Visitors 35
total visitor Total Visitors 1,932,122
slide_5552ef59b5687.pngslide_543b872f6eff8.jpegslide_540d504c65e26.jpeg
14 Mar 2019 - Wawancara Controller Lembaga Sungai-Sungai Sarawak dalam Segmen Selamat Pagi Sarawak di SARAWAKfm

Wawancara

Wawancara

Selesai sesi wawancara sempena hari Tindakan Sungai Sedunia di Konti SARAWAKfm, RTM Kuching selama 30minit secara langsung mulai jam 09:30 hingga 10:00pagi. 

Sila klik untuk menonton rakaman video sepanjang Wawancara tersebut. (Video 1) (Video 2)

12 Mar 2019 - Inspektorat Anugerah Khas Keselamatan Perlindungan (IAKKP) Di Lembaga Sungai-Sungai Sarawak

IAKKP

Program Inspektorat Khas Keselamatan Perlindungan dilaksanakan oleh Pasukan Inspektorat Pejabat Ketua Pegawai Keselamatan Kerajaan Malaysia, Negeri Sarawak, Jabatan Perdana Menteri pada 12 & 13 Mac 2019 di Ibu Pejabat Lembaga Sungai-Sungai Sarawak. Controller LSS, Tuan Richard Tajan telah menyampaikan taklimat sebelum audit ini dijalankan selama 2 hari yang dihadiri oleh pegawai LSS dari seluruh Sarawak dan pegawai Pejabat Ketua Pegawai Keselamatan Kerajaan Malaysia, Negeri Sarawak.
Inspektorat Khas ini adalah bagi mengiktiraf tadbir urus Keselamatan Perlindungan yang terbaik di agensi Kerajaan di Negeri Sarawak dalam usaha ke arah meningkatkan komitmen Ketua Jabatan dan Pegawai Keselamatan secara konsisten mengamal, melaksana dan menguatkuasakan Keselamatan Perlindungan.

26 Feb 2019 - Mandatory for boats to provide life jackets

Richard Tajan

It is mandatory for all SRB registered boats with RTP to provide life jackets.


SIBU: It is mandatory for all boats registered with Sarawak Rivers Board (SRB) with valid river transport permit (RTP) to provide life jackets.

SRB controller Richard Tajan said

...
No Announcement at the moment

1. LSS / HQ /ADMIN / Q/ 12/ 2019

Perkhidmatan Sewaan Mesin Fotostat di Ibu Pejabat- (3 Unit), Wilayah Selatan (1 unit), Lembaga Sungai-Sungai Sarawak Bagi Tempoh Dua (2) Tahun. 

2.LSS/HQ/RIDM/Q/02/2019

Supplying of Labours, Materials, Tools, Plants and Equipment for Grass Cutting and Removal of Debris at Kuala Tatau Checking station, Tatau, Bintulu

3. LSS/HQ/RIDM/Q/03/2019

Supplying of Labours, Materials, Tools, Plants and Equipment for Grass Cutting and Removal of Debris at R.C Wharf, Kuala Baram Checking Station, Kuala Baram

4. LSS/HQ/RIDM/Q/04/2019

Supplying of Labours, Materials, Tools, Plants and Equipment for Grass Cutting and Removal of Debris at 

   i. Limbang R.C Wharf, Main Bazaar, Limbang

  ii. New Limbang Custom Wharf, Main Bazaar, Limbang

  iii. R.C Commercial Wharf Limbang

5. LSS/HQ/RIDM/Q/08/2019

Proposed Dismantle, Dispose and Contruction of Sixteen (16) Units Signboard for All Gazetted Cargo Wharf at Northern Region, Miri. And include the Supply of All Labour, Material, Plant, Fabrication, Equipment, Machineries, Transportation and other Necessary Tools.

6. LSS/HQ/RIDM/Q/07/2019

Proposed Dismantle, Dispose and Contruction of Twenty Seven (27) Units Signboard for All Gazetted Cargo Wharf Complete with Footing Structure for Sarawak Rivers Board at Central Region, Sibu. And include the Supply of All Labour, Material, Plant, Fabrication, Equipment, Machineries, Transportation and other Necessary Tools.

7. LSS/HQ/RIDM/Q/06/2019

Proposed Dismantle, Dispose and Contruction of nine (9) Units Signboard for All Gazetted Cargo Wharf Complete with Footing Structure for Sarawak Rivers Board at Southern Region, Kuching. And include the Supply of All Labour, Material, Plant, Fabrication, Equipment, Machineries, Transportation and other Necessary Tools.

8. LSS/HQ/RIDM/Q/09/2019

Proposed Office Renovations Works at Kuching Passenger Terminal, including dismantling, installation, disposal of waste. The Supply of labour and material, plant, equipment, transportation and others necessary tools.


PENYEWAAN FLOATING BOAT LIFT MILIK LEMBAGA SUNGAI - SUNGAI SARAWAK (LSS)(Muat Turun)

<<March, 2019>>
SMTWTFS
 12
3456789
10111213141516
17181920212223
24252627282930
31 


No event at the moment
No video at the moment
What is your level of satisfaction on the overall services provided by the Sarawak Rivers Board?