Flood Warning System

 

Flood Warning System


Picture

SYSTEM CONFIGURATION & COST

Existing telemetry system at the Barrage was upgraded from 6 stations to additional 18 telemetry stations.

The 18 telemetry stations were fixed with Remote Radio Communication System (RRCS) complete with Flood Warning System features.

 

THE CATCHMENT AREA

Picture

Existing telemetry system at the

1- Kpg. Sandong,                  2- Kpg Bengoh,

3- Kpg Skio,                         4- Kpg Blinbim,  

5- Kpg Siburuh                     6- Kpg Bogag

The 18 telemetry stations were fixed with Remote Radio Communication System (RRCS) complete with Flood Warning System features.

1. Kpg. Pedawan                   2. Kpg. Git     

3. Kpg. Landeh                      4. Kpg. Batu Kitang

5. Kpg. Siniawan                    6. Buan Bidi   

7. Bau JKR Water Treatment Plant     8. Kpg. Grogo         

9. Batu Kawa                        10. Kpg. Paroh     

11. Taman Malihah                12. Taman Yen Yen  

13. Satok Bridge                   14. Kpg. Segedup

15. SRB Chung Hua No.6      16. Sg. Maong Kanan      

17. 2nd Link Bridge                18. Sg. Bintangor

 
image Polls
image Announcement