Flood Warning System
SYSTEM CONFIGURATION & COST
Existing telemetry system at the Barrage was upgraded from 6 stations to additional 18 telemetry stations.
The 18 telemetry stations were fixed with Remote Radio Communication System (RRCS) complete with Flood Warning System features.
THE CATCHMENT AREA
Existing telemetry system at the
1- Kpg. Sandong, 2- Kpg Bengoh,
3- Kpg Skio, 4- Kpg Blinbim,
5- Kpg Siburuh 6- Kpg Bogag
The 18 telemetry stations were fixed with Remote Radio Communication System (RRCS) complete with Flood Warning System features.
1. Kpg. Pedawan 2. Kpg. Git
3. Kpg. Landeh 4. Kpg. Batu Kitang
5. Kpg. Siniawan 6. Buan Bidi
7. Bau JKR Water Treatment Plant 8. Kpg. Grogo
9. Batu Kawa 10. Kpg. Paroh
11. Taman Malihah 12. Taman Yen Yen
13. Satok Bridge 14. Kpg. Segedup
15. SRB Chung Hua No.6 16. Sg. Maong Kanan
17. 2nd Link Bridge 18. Sg. Bintangor